Big Spring Cover project Update – The Bellefonte Borough Authority oversees the water and wastewater policies and projects. PA DEP has requested a feasibility study for the Authority’s desired concept. The Authority has asked its engineering firm for a proposal to complete the feasibility study. The feasibility study, once completed, will be submitted to PA DEP. The Authority is seeking preliminary approval of their desired design concept. The concept would then be designed and permitted by PA DEP. The project is tentatively slated for bidding and construction in 2025.